Case Study
Expanded the Area 41 topsides with new separation modules, utilities, and living quarters coordinated end-to-end in BIM.
Area 41 required new utility modules, LQ spaces, and flare capacity, all stitched into an aging platform with limited deck space.





Scope of work
A concise snapshot of deliverables, disciplines, and the measurable impact we bring to each engagement.
Our process spans the key phases of design through closeout and support.
Targeted interventions that move the metrics that matter.
COG-aware modeling prevented late redesigns.
SimOps rehearsals reduced wait time between crews.
Tap to enlarge any capture from the field or model handoff.
“Seeing every module and lift zone in BIM made simultaneous operations far safer.”