Case Study
Detailed BIM models guided phased gate renovations and ensured uninterrupted passenger flow.
A multi-phase terminal modernization program requiring precise phasing, safety, and live-operations coordination.





Scope of work
A concise snapshot of deliverables, disciplines, and the measurable impact we bring to each engagement.
Our process spans the key phases of design through closeout and support.
Targeted interventions that move the metrics that matter.
Created visual constructability markups and delivered route optimizations which were essential for planning feasible models and drawings.
Helped reduce rework during construction by providing prefabrication-ready plans and clear installation sequences.
Tap to enlarge any capture from the field or model handoff.
“InteliBIM kept our gates open and our teams aligned. The model reviews saved weeks in the field.”